Page 1 of 1

Flex links Designer vs Runtime

Posted: Thu Nov 02, 2006 3:56 pm
by KAB
Kathleen, __Is there a specific requriement (file(s)) required if you are distributing reports with flex links in them?__I currently have a report that will run from designer 10mins, but will not run from the runtime prompt (over an hour).

=> RE: Flex links Designer vs Runtime

Posted: Thu Nov 02, 2006 11:43 pm
by KAB
Kathleen, the report did run, however it took 4 hours using the runtime. Is there something I can do to speed this up?

==> RE: Flex links Designer vs Runtime

Posted: Fri Nov 03, 2006 5:44 pm
by kfleming
Using Flexlink will require R&R to build an index but runtime should not be any more resource intensive that the designer. Was this a one time problem or can it be repeated if you run the report again?____Kathleen__R&R Support

===> RE: Flex links Designer vs Runtime

Posted: Mon Nov 27, 2006 1:25 pm
by KAB
This is repeatable. I have tried on both a production system 30 hours for the runtime and 45 mins for the designer, as well as a testbed system (limited amount of data) 2hrs for runtime and 10 mins for designer.