ParameteRR fields
-
- Posts: 122
- Joined: Tue Oct 10, 2017 12:44 pm
ParameteRR fields
We are using R&R 9 with dates in a British format (DD/MM/YYYY). When we use ParameteRR fields in out reports all dates are shown corectly except the ^New Value^ field which is shown in an American format i.e MM/DD/YYYY. However, if you input a date in an American format you get the message ^Date required. Enter in format MM/DD/YYYY^. You must, in fact, use the British format ven although when you press ^Accept^ the for,at reverts to being American.____This is quite a confusing, allbeit, minor minor bug.____Eddie Marshall__Support Supervisor__LandMaster__eddie@landmaster.co.uk
=> RE: ParameteRR fields
I^m having similar problems with ParameteRR fields. I^ve patched it to 9.0.009. Users get confused and are complaining. Is there a fix for this? Please advise.____Thanks in advance.
==> RE: ParameteRR fields
We do have a fix for this problem. Send me your email address and I will send it out to you.____Kathleen__R&R Support